• Articulated Structure Underground Mining LHD Used for Gold Mine
  • Articulated Structure Underground Mining LHD Used for Gold Mine
  • Articulated Structure Underground Mining LHD Used for Gold Mine
  • Articulated Structure Underground Mining LHD Used for Gold Mine
  • Articulated Structure Underground Mining LHD Used for Gold Mine
  • Articulated Structure Underground Mining LHD Used for Gold Mine

Articulated Structure Underground Mining LHD Used for Gold Mine

After-sales Service: 24 Hours Online
Warranty: 1 Year
Rated Capacity: 3.5 Tons
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Articulated Structure Underground Mining LHD Used for Gold Mine pictures & photos
Articulated Structure Underground Mining LHD Used for Gold Mine
US $30,000-60,000 / Piece
Min. Order: 1 Piece
Diamond Member Since 2018

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company, Group Corporation
  • Overview
  • Product Description
  • Product Parameters
  • Dimensions
  • Detailed Photos
  • Company Profile
Overview

Basic Info.

Model NO.
FKWJ-1
Engine
Germany Deutz Brand
Converter
Dana
Shift Transmission
Dana
Hydraulic Valve
Mico/China
Delivery Date
3-4 Weeks
Extra Service
Free Maintenance
Transport Package
40gp Container
Specification
bucket volume: 1.5 cbm (2 yd)
Trademark
focor
Origin
China
HS Code
84293090
Production Capacity
150 Sets/Month

Packaging & Delivery

Package Size
1124.00cm * 228.00cm * 212.00cm
Package Gross Weight
2000.000kg

Product Description

 

FKWJ-1 scraper Underground mining for gold mines

Product Description

Diesel Scooptram are driven by diesel engines, flexible and adaptable, capable of operating at grade < 25° in the contact lane. Rapid movement between several stopes at the same or different levels. Especially suitable for high strength mining in stope. It is the main mining equipment of stope without pillar sublevel caving and filling method.
The basic structure of diesel scraper is the same as that of underground scraper. It is characterized by the discharge of a large number of carbon monoxide, nitrogen oxides, aldehydes and carbon and other harmful substances in the process of work, pollution of the working environment, damage to human health. Therefore, diesel exhaust has strict requirements, generally specified carbon monoxide ≤30mg/m3, nitrogen oxide ≤8mg/m3. The main technical measures to reduce the harm of exhaust gas are strictly controlling the emission of harmful gas from diesel engine exhaust gas and setting up the exhaust gas purification equipment outside the engine.
Articulated Structure Underground Mining LHD Used for Gold Mine

Product Parameters

Main Configuration and Technical Parameters

Diesel Engine
Brand:         Germany DEUTZ
Rated Power:   52KW/2300rpm
Hydraulic pump
Brand:    SAUER
Type:     Fully reversible variable piston pump
Hydraulic motor
Brand:   SAUER
Type:    Imported Variable piston motor
Transfer case
Type:            Fixed axis helical gear drive
Drive Axle
Brand:           Focor
Hydraulic system
Type:   Working system, steering system, braking system, Oil filling and acceleration system.
Braking System
Type:     Forceps disc, hydraulic release and spring brake
Lubrication system
Manual lubrication
Control system
Manual control
Driver cabin
Reinforced steel panel;
Side-seat layout with good vision
Bucket
Material:  Manganese steel 
Without ejector bucket
General Parameters
Rated capacity:            2000kg                     
Length                    5700mm
Width(bucket):             1395mm
Width(frame):              1300mm
Height(cabin):              1920mm
Bucket volume:             1 m3
Discharging height:         1300mm
Wheelbase:                1880 mm
Min. Ground clearance:      195mm
Departure angle:            15°
Steering angle:             left/right 38°
Rear axle swing:            ±6.5°
Min. Turning radius:         inner 2100 mm
Outer 4120 mm
Loader weight and load capacity
Scooptram weight           6780 kg
Load weight                8780 kg
 
Traveling performance
Forward/backward           0-12 km/h
Gradeability                 25%
Max. Traction:               54KN
Max. Shovel:                45KN
Tyre size                   10.00-20
Tyre pressure:               0.6-0.7 MPa
Oil tank volume
Diesel oil tank:                 60L
Hydraulic oil tank:              120L
Dimensions

 

Articulated Structure Underground Mining LHD Used for Gold Mine
Detailed Photos

 



Articulated Structure Underground Mining LHD Used for Gold Mine



Articulated Structure Underground Mining LHD Used for Gold Mine
Articulated Structure Underground Mining LHD Used for Gold Mine
Articulated Structure Underground Mining LHD Used for Gold Mine
 
Company Profile

 


Articulated Structure Underground Mining LHD Used for Gold Mine




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Articulated Structure Underground Mining LHD Used for Gold Mine pictures & photos
Articulated Structure Underground Mining LHD Used for Gold Mine
US $30,000-60,000 / Piece
Min. Order: 1 Piece
Diamond Member Since 2018

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company, Group Corporation
Management System Certification
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001
Import & Export Mode
Have Own Export License